Ground-to-Grid Subsurface Energy Integration for Flexible, Resilient AI Data CentersThe NeedAI data centers are being built faster than the grid can keep up. In some regions, electricity demands are projected to grow from about 3 GW to 100 GW within a few years. New generation and transmission take much longer to plan, permit and build. AI training loads also ramp steeply and are sensitive to voltage disturbances, which creates reliability risks. Cooling adds significant water and energy use. Conventional siting practices rarely account for these power, thermal and grid constraints together. The TechnologyOSU engineers have developed a "ground-to-grid" (G2G) framework that pairs AI data centers with subsurface energy resources on the same site, such as geothermal generation and underground thermal storage. Coordinated, workload-aware controls manage how power and heat move across the site, so the facility acts as a flexible grid asset instead of a passive load. A companion siting method helps developers find locations where subsurface, grid and community factors line up for faster, more resilient deployment. Benefits/Advantages
|
Tech IDT2026-150 CollegeLicensing ManagerGiles, David InventorsCategories |