# of Displayed Technologies: 1 / 1


Categories

Ground-to-Grid Subsurface Energy Integration for Flexible, Resilient AI Data Centers
TS-077279 — AI data centers are being built faster than the grid can keep up. In some regions, electricity demands are projected to grow from about 3 GW to 100 GW within a few years. New generation and transmission take much longer to plan, permit and build. AI training loads also ramp steeply and are sensiti…
  • College: College of Engineering (COE)
  • Inventors: Leveni, Martina; Chen, Chen; Shafieezadeh, Abdollah
  • Licensing Officer: Giles, David

Loading icon